| Frame/Structures: The frame is progressing on schedule. On Friday the crank mounts were machined and welded in place, the front wheel mounts were finished, the rear end was partially completed, and the angle braces in the frame were mounted. Fairing: A hot wire tool was constructed to cut and shape the foam. A DC transformer is needed to power the tool. Drive Train: The crank mounts are welded in place. The mount for the central hub is partially machined. Controls: The mount for the handlebars is complete. Several other small brackets are also ready to be installed. The seats arrived, but the mounting brackets were missing. They should arrive next week, and then the seats can be mounted. Website Changes: Everyone seems to like the new format for the pictures. You can still click on the photos and enlarge them from the thumbnails below. |
|
©2007 Jeff Bartels Photo album created with Web Album Generator |